Asbestos Removal in South Whittier

Unincorporated South Whittier is part of Los Angeles County, and we take its asbestos testing and removal jobs, from a single ceiling to a full teardown. Every job begins the same way, with samples.

Permits for South Whittier addresses come from LA County Public Works Building and Safety, and the air district’s rules apply if your address is inside its area, which the section below explains. Call us with the address and we will go through what your project involves.

Request a free quote
Upstairs hallway with a textured ceiling, plastic sheeting along the walls and floor, a portable air machine with a hose beside a door and a stair rail on the left.

How we can help

Start with samples

Start with asbestos testing, which tells you what the work will touch and gives the rest of the plan a lab report to rest on.

Textured ceilings

Ceilings with a sprayed or popcorn texture are sampled before anyone touches them. A positive result leads to popcorn ceiling removal, with the waste leaving through a hauler.

Old flooring

A kitchen, bath or hall floor of vinyl tile or sheet vinyl is sampled before it is touched, glue layer included. Positive results lead to floor tile and mastic removal, and the new floor follows.

Wall materials

A wall that is going to be opened gets samples taken from each material in it. Where the drywall, compound or plaster is positive, drywall, joint compound and plaster removal handles it ahead of the rebuild.

Ducts and pipes

Before a new furnace or air handler goes in, the wrapped ducts and insulated pipes get a lab test. A positive test sends the job through HVAC duct and pipe insulation removal first, and the installation follows. When you call, tell us what is being replaced and where the ducts run.

Bigger projects

Remodels that open walls and full teardowns pair the survey with the district notice. After that, renovation and demolition abatement handles the removal, and the lab report stays with your project papers.

South Whittier housing

More than 8 in every 10 homes in South Whittier predate 1980. Half of South Whittier’s homes were built in or before 1957.

Mostly one-unit homes

Homeowners are the larger group here, since renters hold 35.3 percent of households. One-unit homes are 80.9 percent of the stock, and buildings of five units or more hold just 16.7 percent of homes.

Older stock

Homes built before 1950 account for 13.2 percent of the housing in South Whittier, a smaller group inside the larger pre-1980 total.

Permits and district rules

For permits on demolition and alterations involving asbestos, the LA County Public Works Building and Safety referral sheet calls for a notification form, so ask the county which one your project needs.

South Whittier is not on the South Coast Air Quality Management District’s list of incorporated cities, and the district says a place missing from that list may be unincorporated land inside its jurisdiction. Confirm with the district at (909) 396-2336 for your address.

Survey and notice

Rule 1403 wants the survey in hand before demolition or renovation and the notice no later than 10 working days before demolition, or before renovation of 100 square feet or more. We file the notice online.

Garage with painted block walls, a utility sink on the left, a mottled brown floor surface with a patterned patch beside the sink, and a closed garage door.

Frequently asked questions

Can an owner who lives in the house do the work?

Leave the sampling to others. The district advises against owner removal, because of potential exposure and cross contamination, and Rule 1403 sets aside an owner-occupant of a residential single-unit dwelling who personally performs the renovation. The house must be lived in by its owner, so a vacant house, a rental or a business is left out, demolition does not qualify, and laborers, friends and family do not count as the owner. Waste that ends up outside the house is still covered by the rule.

Does a small renovation need the district notice?

Demolition always needs the notice. For renovation, the notice requirement stops below a size line, less than 100 square feet of asbestos-containing surface removed or stripped, and that holds for any type of building. Work practices and waste rules still apply below it, and testing is how you learn which side of the line your job is on.

Who takes the samples?

Surveyors take the samples. Rule 1403 requires the surveyor to hold Cal/OSHA certification and to have passed an EPA-approved Building Inspector course, so please leave sampling to them.

Also see asbestos removal in Artesia, or the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 263-3544

Call (562) 263-3544