Renovation and Demolition Abatement in Bellflower

Typical cost in Bellflower

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

A remodel starts with a survey. A teardown needs the survey too, plus the district notice whether or not asbestos turns up. We take out what tested positive ahead of the work and handle the paperwork.

Bellflower puts the paperwork together at the demolition counter, so the survey, the Rule 1403 notification and any manifest have to be ready together.

Request a free quote
Empty room with a wood floor and clear plastic sheeting over the walls and windows, with a light blue-gray portable air machine and its hose on the floor.

Jobs this covers

Kitchen and bath remodels

A remodel that opens walls, lifts floors or scrapes ceilings is a renovation. It needs the survey first and the district notice. The two exceptions are a renovation removing less than 100 square feet of asbestos-containing material, which needs no notice in any building, and the same small job in a single-unit house, which needs no survey either.

Taking out a bearing wall

Under Rule 1403, taking out a load-supporting wall is demolition, which means both the survey and the district notice apply to the job. Tell us which walls you want gone and whether any holds up the roof or floor above, so we can say which side of that line the remodel lands on.

Whole-house teardowns

A teardown goes in with the survey and the Rule 1403 notification attached to the application, and with the manifest if asbestos was removed.

Additions and accessory units

An addition or backyard unit that cuts into an existing wall or roof can count as demolition if a load-supporting member comes out.

Bellflower paperwork for a teardown

On the city side, Bellflower’s demolition handout lists a comprehensive asbestos survey, the Rule 1403 notification and the hazardous materials manifest if asbestos was removed. We line these up so the application is complete.

The district describes a state-law link between the demolition permit and the notice. Whoever applies gives the local building department a copy of what was submitted to the district, so the notice has to exist before you apply.

Checking a contractor

Hiring for a larger job? Start with the Contractors State License Board listing for the company’s number, then look for the C-22 Asbestos Abatement classification or ASB certification. Ask to see the Cal/OSHA registration for work of 100 square feet or more, and put the license number on the same sheet as the manifest number.

Bathroom opened for a remodel, with the wall beside the tub cut back to framing, floor tile lifted in patches, pastel wall tile still on one side and plastic hanging at the left.

For sampling, see asbestos testing, or go to the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 263-3544

Call (562) 263-3544