Drywall, Joint Compound and Plaster Removal in Bellflower

Typical cost in Bellflower

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+

Before a wall is opened, drywall, the joint compound at its seams and any plaster are sampled. Positive material is removed under the district rules, and rebuilding the wall is a separate job.

Because the survey rule reaches wall and ceiling cavities as necessary, a wall that is about to be opened gets surveyed ahead of demolition or renovation. A single-unit house with under 100 square feet of renovation is spared the survey.

Request a free quote
Room with plastic sheeting over two windows and the floor, and a section of wall between the windows opened to bare plaster and wood framing, with a bag beside it.

Wall and ceiling materials

Drywall and joint compound

Sheets of drywall and the compound along their seams are different materials, so a lab result on one says nothing about the other. When you call, tell us whether the wall has been painted over or patched before, so the sampling covers each layer.

Plaster walls and ceilings

Plaster is sampled the same way before it is scraped, cut or knocked down. A positive result moves the job under the district rules, with the notice and registration lines that go with its size.

Inside the wall

Wall and ceiling cavities are sampled as necessary, so a wall that is still closed up is not skipped in the survey.

Patching and finishing

Patching, new drywall, texture and paint come after the abatement and are a separate job from the removal itself.

When a wall comes out

Opening or removing a wall can shift which rules apply, depending on what the wall supports and how much material is involved. Tell us which walls are coming out and whether any of them carries weight.

Load-bearing walls

Pulling a bearing wall changes the category of the job, because Rule 1403 counts the taking out of a load-supporting structural member as demolition. Demolition always needs a survey and a district notice, whatever else is in the plans.

Smaller wall jobs

Where a renovation takes out less than 100 square feet of asbestos-containing surface, the notice requirement does not apply, whatever the building. Work practices and waste rules still do.

Crew registration

At 100 square feet or more of material, the employer doing the work must hold a Cal/OSHA registration before starting.

Empty room with a wood floor and clear plastic sheeting over the walls and windows, with a light blue-gray portable air machine and its hose on the floor.

See HVAC duct and pipe insulation removal for heating work, or the home page.