Asbestos Removal in Artesia

If you own or manage property in Artesia and a remodel or teardown is coming, we handle asbestos testing and removal for it, from a single ceiling to the whole house. The first step is always samples, and the lab report tells us which rules apply.

Three bodies set the rules, the air district for the work, Cal/OSHA for the workers and the Contractors State License Board for the contractor. Give us the address and the planned work, and we will say what applies.

Request a free quote
Close view of textured tan stucco with a small gray patched area and hairline cracks.

How we can help

Samples first

Unsure what a material is? Book asbestos testing, and the lab report tells you before anyone cuts, scrapes or lifts.

Ceiling texture

After a ceiling sample comes back positive, popcorn ceiling removal takes the texture off and the waste leaves with the hauler. Tell us how many rooms are involved and we will plan around that.

Old vinyl floors

Tile, sheet vinyl and the glue under them go to the lab before a new floor is planned. If they test positive, floor tile and mastic removal comes first, then the flooring contractor.

Wall surfaces

Planning a new bathroom or a bigger kitchen? Should a wall come open, we sample the drywall, the compound at its seams and the plaster beforehand. A positive result leads to drywall, joint compound and plaster removal before the rebuild.

Furnace and duct work

A house with a new furnace or air conditioner on the way should have its wrapped ducts and pipe lagging sampled in advance. Positive samples mean HVAC duct and pipe insulation removal comes first and the equipment follows.

Remodels and teardowns

For anything bigger, the survey and the district notice come first. After that, renovation and demolition abatement takes out the positive material, and you keep the lab report with your project papers.

Artesia housing

The survey rule has no build-year cutoff, so age never excuses a newer Artesia house. Still, Artesia’s stock leans old, since half of Artesia’s homes were built in or before 1966 and more than 7 in every 10 predate 1980.

Houses and apartments

Renters hold 50.5 percent of Artesia households, so landlords and managers are part of the picture. One-unit homes are 70.9 percent of the stock, and apartment-size buildings, five units or more, hold 19.0 percent of homes.

What the carve-outs reach

If your Artesia building has apartments, townhouses or condominiums in it, Rule 1403 does not treat it as a residential single-unit dwelling, and that keeps the small-renovation survey carve-out and the owner-occupant provision away. Say so when you call.

District rules for the work

South Coast Air Quality Management District lists Artesia among its incorporated cities, which puts houses and other buildings there under Rule 1403. The rule calls for the survey prior to any demolition or renovation, and the notice is due no later than 10 working days before demolition, and before renovation of 100 square feet or more.

Who files what

The district notice is something we file online, with the notification fee the district requires. Ask any removal company for its Cal/OSHA registration and its CSLB license number.

Confirming for your address

Rules can turn on the details of an address, so verify before you start. The district answers asbestos questions at (909) 396-2336, and the building department can speak to local permits. Have the address and the planned work ready when you call either one.

Entry hall with patterned vinyl flooring, plastic sheeting along the left wall, a paneled front door and an open doorway to a half bath.

Frequently asked questions

Is Artesia inside South Coast AQMD?

The district lists Artesia among the incorporated cities in its four-county jurisdiction, so Rule 1403 covers asbestos work on buildings there.

Can I take samples myself?

Please leave sampling to a surveyor. Rule 1403 sets two requirements for whoever does the survey, Cal/OSHA certification and a passed EPA-approved Building Inspector course, and our work follows from the lab report.

Who tests the air after removal?

After removal, an independent consultant runs the clearance air test. California law keeps contractors from performing it, so it is not part of what we do. Ask the consultant for the result in writing and keep it with your other project papers.

See also asbestos removal in South Whittier, or visit the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 263-3544

Call (562) 263-3544